Customization: | Available |
---|---|
Application: | Industry, School, Hospital, Lab |
Customized: | Customized |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Furnace Structure |
|
Power Input | 208-240 AC, 50/60 Hz single phase, 9 KW Max. (60A breaker required) |
Heating Elements |
|
Heating Zone | 12" length with 4" constant temperature zone within +/-5ºC uniformity |
Working Temperature |
|
Max. Heating Rate | 50ºC/sec |
Cooling Rate |
|
Thermocouple | K type, the head of the thermocouple touches the Aluminum Nitride sample holder from underneath |
Temperature Controller |
|
Temperature controller (optional) |
|
Quartz Tube & Sample Holder |
|
Vacuum Flange |
|
Vacuum Pump (optional) |
|
Water Cooling (optional) |
|
Flow-meter | One flow meter is installed on the front panel for adjusting gas flow from 16 - 160 ml/min |
Vacuum Gauge | Digital vacuum gauge with a measurement range from 10-4 to 1000 Torr is installed on the furnace. |
Vacuum Pressure & Gas Fitting |
|
Dimensions |
|
Net Weight | 70 kg (150 lbs) |
Warranty | One year limited manufacturer warranty with lifetime support (Consumable parts such as processing tubes, o-rings and halogen lamps are not covered by the warranty, please order replacements at related products below). |
Laptop, software & WiFi Control(Optional) |
|
Compliance | Please select the certificate in options bar: CE Certificate & UL/CSA ready: CE approval, ready to pass UL/CSA certificate UL certircate - UL apprval (UL 61010), at extra cost |
Optional |
|
Application Notes |
|
Furnace Structure |
Single heating zone
|
Dual heating zone
|
|
Power | Single heating zone Power: 208-240VAC, 50/60Hz, single phase, 2.5KW ( 20A Breaker required) |
Dual heating zone Power: 208-240VAC, 50/60Hz, single phase, 4 KW ( 50A Breaker required) 10 feet power cable with no plug (ask a licensed electrician to do the plug) |
|
Heating Temperature |
|
||
Heating & Cooling Rate |
( You shall calibrate temperature and heating cooling rate at your working condition before use ) Heating plot Cooling plot |
||
Fused Quartz Tubes |
|
||
Vacuum Flanges |
Using dual tube for inducing CVD growth on metal foil (wrapped around interior tube surface):
Ultimate vacuum pressure: 10^-2 torr (by mechanical pump) 10^-5 torr (by turbo molecular pump) |
||
Temperature Controller |
|
||
Mass Flow Meters & Gas Mixing Station |
|
||
Vacuum Pump Station and valves | Optional 1:
|
Optional 2:
|
|
Water Cooling Function | Water cooling on the flange is mainly for cooling down the o-ring inside the flange to ensure the best-sealed chamber at high temperature:
|
||
Optional Parts (building up a single tube furnace) | You can build up an 80mm Dia. single tube reaction chamber by ordering extra sealing flanges and install them onto interior tube:
|
||
Dimension |
|
||
Shipping |
|
||
Warranty | One year limited manufacturer's warranty (Consumable parts such as processing tubes, O-rings, and heating elements are not covered by the warranty, please order replacements at related products below). | ||
Laptop, software & WiFi Control (Optional) |
|
||
Compliance |
|
||
Application Notes |
|
||
Warning |
|
---